The Cooperative reserves the right to deny or terminate service to any consumer whose wiring or equipment shall constitute a hazard to the Cooperative's equipment or its service to others. However, it disclaims any responsibility to inspect the consumer's wiring, equipment or any subsequent wiring changes or modifications and shall not be held liable for any injury or damage resulting from the condition thereof. The Consumer shall be responsible for the adequate performance of their owned facilities. Before purchasing equipment or installing wiring, it shall be the consumer's responsibility to check with the Cooperative as to the characteristics of the service available. The Cooperative reserves the right to make reasonable service charges for work performed by Cooperative personnel from malfunction of the consumer's facilities.
| One employee and service truck, regular working hours | $40/per hr. |
| Two employees and service truck, regular working hours | $70/per hr. |
| One employee and digger or bucket truck, regular working hours | $90/per hr. |
| Two employees and digger or bucket truck, regular working hours | $120/per hr. |
| One employee and service truck, outside regular hours | $50/per hr. |
| Two employees and service truck, outside regular hours | $90/per hr. |
| One employee and digger or bucket truck, outside regular hours | $120/per hr. |
| Two employees and digger or bucket truck, Outside regular hours | $150/per hr. |
| Reconnects | $60 |
| Reconnects after regular hours | $120 |
| Collection fee and meter reading fee | $25 |
| Meter test charge | $15 |
| NSF check charge | $25 |
| Service Calls-Regular hours | $100 |
| Service Calls-Overtime | $150 |
| Locating members’ URD Wires | $50 |
This section of rules and regulations sets forth the terms and conditions under which the Cooperative will construct and extend its facilities to serve new loads or replace, relocate and otherwise modify its facilities. The Cooperative holds itself responsible to render service to all consumers within its service area who apply for membership in and service from the Cooperative; that service shall comply with those rules determined to apply based on the class of service required. The route and type of construction for line extensions will be selected by the Cooperative based on construction policy. Contributions in aid of construction or any other deposit required by the Cooperative under the provisions of this policy shall be non refundable unless specifically stated otherwise. No refund will be made in excess of the original amount deposited. Refunds, when applicable, will be governed by the terms stated hereinafter. Each line extension project, done by member request, will be assessed to that member as a separate, distinct project. If, at a later date, another connection is requested originating from a line extension project previously billed, the Board of Directors will determine an amount of construction costs to be paid by the later requesting party and refunded to the original payer.
Copyright © :: All Rights Reserved :: Site Developed in part by Basin Electric Power Cooperative